113. ALKAYA İNŞAAT - TCDD ADANA 6  BÖLGE MÜDÜRLÜĞÜ:  LINE IMPEDANCE MEASUREMENT  

        Measurement of line impedances by giving fault test voltage on lines under the responsibility of TCDD Adana 6th Regional Directorate, renewing the setting values in distance protection relays according to these values.

        

112. TCDD ADANA 6 REGIONAL DIRECTORATE: KONYA – KARAMAN LINE STEP – TUCH VOLTAGE MEASUREMEN    

        Under the responsibility of TCDD Adana 6th Regional Directorate, step-tuch voltage measurement on the line length by flowing 50 A current on the Konya-Karaman train line.


111. TCDD TEKNİK - TCDD KONYA KARAMAN TM VE ÇUMRA TM: ANNUAL MAINTENANCE    

    TCDD Karaman SS and Cumra SS annual heavy maintenance work.


110. SIEMENS - TCDD MALATYA REGIONAL DIRECTORATE REPLACEMENT SERVICE OF 12 PCS 27 KV BREAKERS IN SUBSTATIONS UNDER THE RESPONSIBILITY  

        Disassembly, assembly, testing and commissioning of 12 units of 27kV single-phase breakers in Akgedit TM, Hekiman TM, Yazıhan TM, Yazlak TM, Doğanşehir TM, Gölbaşı TM, which are under the responsibility of Siemens' TCDD Malatya Regional Directorate.


109. SIEMENS - TCDD ANKARA - SİVAS HIGH SPEED RAILWAY PROJECT: 154 / 27,5 KV SUBSTATIONS INSTALLATION TEST AND MAINTENANCE TRAINING    

        Within the scope of Siemens' high-speed train project, training of TCDD personnel on transformer centers, theoretically and practically, on substation design, engineering calculations, preparation of projects, assembly, maintenance and repair for 14 days. Preparation of training documents, making applications in the field.


108. SIEMENS - TCDD ANKARA - SİVAS HIGH SPEED RAILWAY PROJECT 154 / 27,5 KV SUBSTATIONS: INSTALLATION, PRIMARY- SECONDARY TEST AND COMMISSIONING     

         As the internationally registered supplier of Siemens, the service of completing the missing production of 13 transformer centers made within the scope of the project, performing the tests and commissioning them.


107. TEİAŞ HAYRABOLU SS PRIMERY - SECONDERY INSTALLATION

         Fulfilling the construction works of Hayrabolu TM, which was tendered within the scope of ITM, on behalf of the main company.


106 BB - İSTAÇ SOLID WASTE ENERGY CYCLE PLANT 154 KV SUBSTATION PRIMERY - SECONDERY INSTALLATION

        Fulfillment of the construction works of the 154 kV transformer center of the İSTAÇ solid waste power plant, which was tendered by the Istanbul Metropolitan Municipality.


105. BATMAN 1 TM: 154/36 KV SWITCHYARD EXTENTION – PRİMERY AND SECONDARY INSTALLATION

        Execution of the extension works on behalf of the main company in Batman 1 TM, which was tendered within the scope of ITM        


104. KULA BES: BİO GAS POWER PLANT COMMISSIONING

        Conducting ministry acceptance tests of the BIO GAS power plant within the company       


103. ENERGROM : BİO GAS POWER PLANT COMMISSIONING

           Conducting ministry acceptance tests of the BIO GAS power plant within the company       



102. TCDD ANKARA SİVAS HIGH SPEED RAILWAYS : GROUND STEP AND TUCH VOLTAGE MEASUREMENTS

        Conducting grounding tests on the lines made within the scope of the project.


101. TAŞKESİĞİ SOLAR POWER PLANT: COMMISSIONING

        Carrying out ministry acceptance tests of the Solar Power Plant.


100. TCDD 3rd REGIONAL DIRECTORATE: TRANSFORMER REPAIRING

        Repairing single-phase, low-power, faulty transformers used by the TCDD and making them ready for re-use.     


99. TCDD HIGH SPEED RAILWAYS NENEK SS:  COMMISSIONING

       Conducting commissioning tests of the substation within the scope of the project.


98. TCDD ANKARA - SİVAS HIGH SPEED RAILWAYS: CATHENER LINE ISOLATION TEST

        Performing insulation tests of the line assembled within the scope of the project.


97. GÜNGÖR ELEKTRİK - KULA BİO GAS POWER PLANT COMMISSIONING

        Conducting ministry acceptance tests of the BIO GAS power plant within the company       


96. ENERGROM: BİO GAS POWER PLANT COMMISSIONING

          Conducting ministry acceptance tests of the BIO GAS power plant within the company


95. YUPOL MÜHENDİSLİK: REPLACING THE PROTECTION PANEL

        Replacing the protection - control panel in the MV cubicle, which is under the responsibility of the company.     


94. MERTEK ELEKTRİK: MV CUBICLE AND 100 kVA TRASFORMER MAINTENANCE

         Maintenance of MV cubicle and transformers under the responsibility of the company.


93. MAT ENERJİ: 154 kV CIRCUIT BREAKER TEST

          Performing relevant tests within the scope of commissioning.


92. GAZİRAY SS: 154/27 KV SWITCHYARD TEST AND COMMISSIONING 

          Conducting Primary tests within the scope of commissioning tests of Gaziray SS, which was built within the scope of Gaziantep Rail System.     


91. TCDD 3rd REGIONAL DIRECTORATE MANİSA SS: RELAY SETTING CHANGE AND TEST

        Making and testing the setting changes related to the institution demand at the substation within the institution.      


90. ELTA MAKİNA: 154 KV CIRCUIT BREAKERS MAINTENANCE

         Addition of the decreasing gases of the circuit breakers in the 154 kV switchgear within the company.


89. MİS ENERJİ - MİS 3 JES: GEOTHERMAL POWER PLANT 154 kV SWITCHGEAR MAINTENANCE

          Maintenance of the 154 kV switchgear of the power plant.


88. MORSB: 154 KV SWITCHGEAR / BATTERY RECTIFIER REPLACEMENT

        Replacing battery rectifiers of 154 kV switchgears under the responsibility of Manisa Organized Industrial Zone        


87. ABB MOSB: 154 KV SWITCHGEAR MAINTENANCE

        Maintenance of 154 kV switchgears under the responsibility of Manisa Organized Industrial Zone, which is within the scope of ABB.


86. GÜNGÖR ELEKTRİK - GÖKZİRVE RES WIND POWER PLANT: WIND TOWER SOIL RESISTANCE MEASUREMENT

         Performing the necessary tests before the construction of the wind towers to be assembled within the scope of the project.


85. TCDD HIGH SPEED RAILWAY PROJESİ - NENEK TM : RELAY TEST

        Performing the relay tests needed in the substation commissioned within the scope of the project.


84. DSI 21st REGIONAL DIRECTORATE: TROUBLESHOOTING

         Analyzing the complaints experienced in the transformer, which is the responsibility of the institution, and eliminating the causes that cause the malfunction.


83. FİNA - TEKNO RÜZGAR- PAZARKÖY RES WPP:  ENGINEERING AND CONSULTING SERVICE

        Providing control and consultancy services on electrical works on behalf of the main company in the installation of the power plant.


82. MERSİNLİ RES WPP:  154 KV SWITCHYARD INSTALLATION, TEST AND COMMISSIONING

        154 / 36 kV gold primary - secondary assembly and test - commissioning works of the wind farm.


81. LODOS KARABURUN RES:  COMMISSIONING

        Performing the relevant tests of the wind towers commissioned at the power plant within the scope of the ministry's acceptances.


80. KAZANIM ENERJİ - BAFA RES WPP: METER TEST 

         Performing the tests of the meters within the scope of the Ministry's acceptance.


79. DORUK ENERJİ: DISCONNECTOR CALIBRATION

        Elimination of malfunctions detected during 154 kV switchgear maintenance.


78. DORUK ENERJİ: RELAY TEST

        Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.     


77. KAZANIM ENERJİ: SELVAZ GROUNDING TEST

         Conducting relevant tests within the scope of Ministry Acceptance.


76. GÜNGÖR ELEKTRİK: SELVAZ GROUNDING TEST

        Conducting relevant tests within the scope of Ministry Acceptance.


75. GÜNGÖR ELEKTRİK - GÖKZİRVE RES : SOIL RESISTANCE MEASURING

        Testing for control purposes before ministry acceptances upon the request of the company.        


74. BERGRES: RELAY TEST

        Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.     

  

73.  LODOS KARABURUN RES:  COMMISSIONING

        Performing the relevant tests of the wind towers commissioned at the power plant within the scope of the ministry's acceptances.


72. ALAŞEHİR TM: PROTECTION RELAY ASSAMBLY AND TEST

        Testing and commissioning of relays found to be defective in the substation.


71. ABB MAYR MELNHOF: MV TRANSFORMERS AND CUBICLE  MAINTENANCE

          Maintenance of MV transformers and cubicle in the company's production area.


70. TCDD IZMIR 3rd REGIONAL DIRECTORATE: TRANSFORMER REPAIRING

      Repairing single-phase, low-power, faulty transformers used by the TCDD and making them ready for re-use.

      

69. KAZANIM ENERJİ: 154 SWITCHGEAR EARTHING TEST AND CIRCUIT BREAKER TEST

        Conducting the relevant tests at the switchgear within the scope of the Ministry's acceptance.


68. TCDD IZMIR 3rd REGIONAL DIRECTORATE: TRANSFORMER REPAIRING

Repairing single-phase, low-power, faulty transformers used by the TCDD and making them ready for re-use.

      

67. TÜMAD MINING CO.: PROTECTION RELAY TRAINING

        Giving training to the personnel working in the substations within the company about the relays under their responsibilities.


66. ALAŞEHİR SS: PROTECTION RELAY ASSAMBLY AND TEST

        Testing and commissioning of relays found to be defective in the substation.


65. TCDD ANKARA - SİVAS HIGH SPEED RAILWAY PROJECT: EARTING TEST

        Conducting grounding tests on catenary lines built within the scope of the project.


64. TCDD IZMIR 3rd REGIONAL DIRECTORATE :  TRANSFORMER REPAIRING

        Repairing single-phase, low-power, faulty transformers used by the TCDD and making them ready for re-use.


63. BARTIN OSB: MV CABLE TEST 

        Testing and commissioning of MV cables assembled within the scope of BOSB.


62. DEMİRER KABLO - ATAER ENERJİ : SOURGE ARRESTER PRIMERY TEST

     Testing and commissioning of the replaced surge arrester.


61. BURSA DGKÇS 380/154 kV TM: BUSBAR PROTECTION RELAY TEST

        Configuring and testing the renewed BUS PROTECTION system of the substation within the scope of commissioning studies.


60. TCDD IZMIR 3rd REGIONAL DIRECTORATE MENEMEN SS: 10 MVA TRANSFORMER DISASSAMBLY - ASSAMBLY

        Dismantling and transporting the 10 MVA transformer in the Menemen Transformer Substation to the warehouse, preparing it to standby as a spare. Installation of 25 MVA transformer instead of the dismantled transformer.


59. ABB KOVADA 2 HES - HPP : INSTALLATION, TEST AND COMMISSIONING

        Installation of 154 KV Substation, test and commissioning


58.  ARPA HES - HPP /   ARTVİN  :  RELAY TEST

        Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


57.   BORNOVA 380 GIS  -  BORNOVA İZMİR  :  SELVAZ GROUNDING TEST

        The grounding system of the GIS center established by TEIAS was measured by the SELVAZ method


56.  URLA 2 SS  - URLA İZMİR  :  PROTECTION RELAY DISASSEMBLY – ASSAMBLY

        Due to the physical changes made in the two feeders in the substation belonging to TEİAŞ, the replacement of the relays came to the fore, and the existing line differential relays were replaced with distance protection relays.


55.  META SS  - GÖRDES MANİSA  : 154 FEEDER INSTALLATION, TEST AND COMMISSIONING

        Feeder addition work was carried out by TEİAŞ at META Transformer Center, which is a private substatıon. Within the scope of the work, primary and secondary projects of the new feeder were prepared, panels were produced, primary and secondary assembly were made, primary, secondary, relay and measuring instruments were made and commissioning works were carried out.


54.  ÇİNE SS  -  ÇİNE AYDIN  :  RELAY TEST 

        Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


53.  BİGA SS – BİGA ÇANAKKALE  : AUTOPROCUCER FEEDER INSTALLATION, TEST AND COMMISSIONING

        Primary - Secondary tests of the autoproducer feeder built in the substation and tests of the protection relays were carried out.


52.  KAYNAŞLI RES  -  BOLU  : RELAY TEST

            Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


51.  HABAŞ – ALİAĞA İZMİR  : TEST AND COMMISSIONING

        Primary and Secondary tests of the facility were carried out. Within the scope of the tests, the ratio, polarity and load controls of the current and voltage transformers were made, the contact transitions of the disconnector and the circuit breaker were measured, the opening and closing times of the circuit breaker were measured, and the insulation tests of the current transformers, voltage transformers, circuit breaker and surge arresters were carried out.


50.  BEŞTEPELER KUBİLAJ JES GPP  -  AYDIN  :  SELVAZ GROUNDING TEST

        The grounding system of the Geothermal Power Plant was measured by the SELVAZ method.


49.  TCDD KARAMAN SS  - KARAMAN KONYA :  SECONDARY INSTALLATION, TEST AND COMMISSIONING

        T.C.D.D. (REPUBLIC OF TURKEY STATE RAILWAYS) Secondary assembly, primary – secondary tests, measuring instrument and relay tests and commissioning processes were carried out in the entire switchgear facility of Karaman TS, which was built within the scope of the High Speed Train Project.


48.  KARABURUN RES WPP– KARABURUN İZMİR  : RELAY TEST

        Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


47.  ÖDEMİŞ RES  WRR -  İZMİR  :  MV CABLES TEST

DC Hi-Pot tests of the MV cables of the Wind Power Plant were carried out.


46.  STAR REFİNERY  - ALİAĞA İZMİR  : SELVAZ GROUNDING TEST

        In the newly built facilities of the STAR refinery, the grounding system was measured using the SELVAZ method, and step and contact voltage measurements were made.


45.  SEYİTALİ RES WPP -  İZMİR  : RELAY TEST

        Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


44.  BURGAZ RES WPP  -  ÇANAKKALE  : REALY TEST

        Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


43.  POYRAZ RES  WPP -  KUPSUT BALIKESİR  : RELAY TEST

        Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


42.  SAYALAR RES WPP  - URLA İZMİR  : RELAY TEST

        Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


41.  KOZBEYLİ RES WPP - FOÇA İZMİR  : RELAY TEST

        Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


40.  SAMURLU RES WPP - MANİSA  : RELAY TEST

        Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


39.  SOMA RES WPP - SOMA MANİSA  : RELAY TEST

         Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


38.  GEYCEK RES WPP -  AYDIN  : RELAY TEST

        Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


37.  MELİH JES  GPP -  GERMENCİK AYDIN  : TEST AND COMMISSIONING

        Primary and Secondary tests of the facility were carried out. Within the scope of the tests, the ratio, polarity and load controls of the current and voltage transformers were made, the contact transitions of the disconnector and the breaker were measured, the opening and closing times of the breaker were measured, and the insulation tests of the current transformers, voltage transformers, breaker and surge arresters were carried out.


36.  KUBİLAY JES GPP  - AYDIN  : BUSBAR PROTECTION RELAY TEST 

        It has been tested that the busbar protection relays of the company's 154 kV salt plant are working properly.

    

35.  TURCAS JES GPP -  AYDIN  : SELVAZ GROUNDING TEST

        The equivalent impedance of the grounding system of the facility was measured with the SELVAZ method.


34.  MEHMETHAN JES GPP -  AYDIN  : PROTECTION RELAY TEST

        Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


33.  MASPO   -  ALAŞEHİR MANİSA  : SELVAZ GROUNDING TEST

        The equivalent impedance of the grounding system of the facility was measured with the SELVAZ method.


32. ÖZMEN JES GPP -  ALAŞEHİR MANİSA  : BUSBAR PROTECTION RELAY TEST

        It has been tested that the busbar protection relays of the company's 154 kV salt plant are working properly.


31.  UMURLU JES GPP– AYDIN  : GROUNDING SYSTEM INSPECTION

        Due to the problems experienced in the facility, the existing grounding system was measured, the grounding of the facility was examined and an evaluation was made regarding the problem.


30. BURHANİYE SS  - EDREMİT BALIKESİR : SECONDERY TEST AND RELAY TEST 

        Secondary tests of the facility were carried out. Within the scope of the tests, ratio polarity and load controls of current and voltage transformers were made. Tests of protection relays were also carried out at the facility.


29.  AKINCI HES HPP – SAMSUN  : SECONDERY TEST

        Ratio, polarity and load tests of current and voltage transformers in the facility were carried out.


28.  ERMENEK SS  -  KONYA : SECONDERY INSTALLATION, TEST AND COMMISSIONING

        The secondary assembly of the facility was made and the primary and secondary tests were carried out. Within the scope of the tests, the ratio, polarity and load controls of the current and voltage transformers were made, the contact transitions of the disconnector and the circuit breaker were measured, the opening and closing times of the breaker were measured, and the insulation tests of the current transformers, voltage transformers, circuit breaker and surge arresters were carried out.


27.  GİRESUN SS   -  GİRESUN  : TEST AND COMMISSIONING

Primary and Secondary tests of the facility were carried out. Within the scope of the tests, the ratio, polarity and load controls of the current and voltage transformers were made, the contact transitions of the disconnector and the circuit breaker were measured, the opening and closing times of the breaker were measured, and the insulation tests of the current transformers, voltage transformers, breaker and surge arresters were carried out. In addition, the locking system was checked and commissioning studies were carried out.


26.  OSMANİYE SS – ADANA  : SECONDERY INSTALLATION, TEST AND COMMISSIONING


        The secondary assembly of the facility was made and the primary and secondary tests were carried out. Within the scope of the tests, the ratio, polarity and load controls of the current and voltage transformers were made, the contact transitions of the disconnector and the circuit breaker were measured, the opening and closing times of the breaker were measured, and the insulation tests of the current transformers, voltage transformers, circuit breaker and surge arresters were carried out.


25.  ELEŞKİRT SS – AĞRI  : SECONDERY INSTALLATION, TEST AND COMMISSIONING


        The secondary assembly of the facility was made and the primary and secondary tests were carried out. Within the scope of the tests, the ratio, polarity and load controls of the current and voltage transformers were made, the contact transitions of the disconnector and the circuit breaker were measured, the opening and closing times of the breaker were measured, and the insulation tests of the current transformers, voltage transformers, circuit breaker and surge arresters were carried out.


24.  VİRANŞEHİR SS  - MARDİN  : RELAY TEST

Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


23.  OSMANCA SS – İZMİT  : RELAY TEST

Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


22.  380 / 154 KV BATMAN SS – BATMAN  : TEST AND COMMISSIONING

Primary and Secondary tests of the facility were carried out. Within the scope of the tests, the ratio, polarity and load controls of the current and voltage transformers were made, the contact transitions of the disconnector and the circuit breaker were measured, the opening and closing times of the breaker were measured, and the insulation tests of the current transformers, voltage transformers, breaker and surge arresters were carried out. In addition, the locking system was checked and commissioning studies were carried out.


21.  SOMA ÇİMENTO SS – SOMA – MANİSA  : TEST AND COMMISSIONING

Primary and Secondary tests of the facility were carried out. Within the scope of the tests, the ratio, polarity and load controls of the current and voltage transformers were made, the contact transitions of the disconnector and the circuit breaker were measured, the opening and closing times of the breaker were measured, and the insulation tests of the current transformers, voltage transformers, breaker and surge arresters were carried out. In addition, the locking system was checked and commissioning studies were carried out.


20.  154 KV CEYHAN – 1, CEYHAN – 2 VE KOZAN TM – ADANA : TEST AND COMMISSIONING

        Primary and Secondary tests of the facility were carried out. Within the scope of the tests, the ratio, polarity and load controls of the current and voltage transformers were made, the contact transitions of the disconnector and the circuit breaker were measured, the opening and closing times of the breaker were measured, and the insulation tests of the current transformers, voltage transformers, breaker and surge arresters were carried out. In addition, the locking system was checked and commissioning studies were carried out.


19.  YEŞİLYURT DEMİRÇELİK SS  - SAMSUN  : RELAY TEST

Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


17. PERENCO TM – DİYARBAKIR : TEST AND COMMISSIONING

        Primary and Secondary tests of the facility were carried out. Within the scope of the tests, the ratio, polarity and load controls of the current and voltage transformers were made, the contact transitions of the disconnector and the circuit breaker were measured, the opening and closing times of the breaker were measured, and the insulation tests of the current transformers, voltage transformers, breaker and surge arresters were carried out. In addition, the locking system was checked and commissioning studies were carried out.


16.  KORES WPP – İZMİR  :  RELAY TEST

        Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


15.  GERES WPP – İZMİR   : RELAY TEST

        Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


14. YUNT DAĞI RES – BERGAMA İZMİR  : RELAY TEST

        Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


13.  ŞEHZADE RES WPP  - AMASYA  : 154 kV SWITCHYARD ANNUAL MAINTENANCE AND WIND TOWERS SELVAZ MEASUREMENT / GROUNDING SYSTEM INVESTIGATION

        Within the scope of the annual maintenance of the facility's 154 kV switchgear center, all steel reinforcement and connections of primary materials were checked, primary and secondary tests and relay tests of all devices were carried out. In the MV switchgear facility, within the scope of primary and secondary tests, current and voltage transformers in the cubicles were tested, circuit breaker tests were carried out, relay and measuring instruments tests were carried out. Apart from this, the grounding systems of all wind towers in the facility were measured with the SELVAZ method, and an investigation was made about the problems related to the grounding in the facility.


12.  ATAŞEHİR 380 GIS  - İSTANBUL  : TEST AND COMMISSIONING

        Primary and Secondary tests of the facility were carried out. Within the scope of the tests, the ratio, polarity and load controls of the current and voltage transformers were made, the contact transitions of the disconnector and the breaker were measured, the opening and closing times of the breaker were measured, and the insulation tests of the current transformers, voltage transformers, breaker and surge arresters were carried out.


11.  BURÇAK 1 RES , WPP BURÇAK 2 RES WPP –  ŞEBİNKARAHİSAR GİRESUN  RELAY TEST

        Protection relays were tested at the 154 kV salt plant, and new setting values were loaded according to the Protection Philosophy Workshop declaration published by TEIAS.


10.  BORUSAN SS – KONYA  : RELAY TEST AND SELVAZ GROUNDING TEST

        The protection relays of the MV cells of the Gas Cycle Power Plant operating in combination with the Solar Power Plant of Borusan Company in Konya Organized Industrial Zone were tested and the grounding system of the plant was measured by the SELVAZ method.


9.  TUMAR MADENCİLİK SS  - LAPSEKİ ÇANAKKALE  : BUSBAR PROTECTION RELAY TEST

        It has been tested that the busbar protection relays of the company's 154 kV salt plant are working properly.


8.  URFA TEMİZ ENERJİ SS – ŞANLIURFA  : RELAY TEST

        Protection relays were tested at the 154 kV salt plant of the energy generation facility of the Temiz Enerji company in Şanlıurfa, and new setting values were uploaded according to the Protection Philosophy Workshop declaration published by TEİAŞ.


7.  380 KV ÇAN 2 SS  - ÇAN ÇANAKKALE   : ÇAN 2 TERMAL POWER PLANT  TEST AND COMMISSIONNIG

        Primary, secondary, relay and measuring instruments tests and commissioning studies of the entire system in the 380 kV salt plant of the thermal power plant, the second of which was established in Çanakkale Çan district, were carried out.


6.  DARICA RES 2 HPP   - ORDU  : SECONDERY TEST

        154 kV feeder secondary tests were carried out at the 154 kV salt plant of the hydroelectric power plant. Within the scope of the tests, current transformer saturation, ratio, polarity, load, voltage transformer load tests were carried out.


5.  SFC FOREST PRODUCTS FACILITIES – KASTAMONU  : SFC CO. 154 / 36 kV SUBSTATION TEST AND COMMISSIONING

        154 kV Switchgear test commissioning, thermal imager review – factory thermal imager review Primary, secondary, commissioning, measuring instruments and relay tests were carried out in all energy systems of the 154 /34.5 kV salt center built by the industrial establishment in Kastamonu to meet the increasing energy needs. In the following process, thermal camera inspection was carried out both in the 154 kV center and in the entire energy distribution system of the factory.


4. KOSB TM – KONYA  : KONYA OSB SS  SUBSTATION TEST  AND COMMISSIONING 

        In order to meet the increasing energy need of Konya Organized Industrial Zone, primary, secondary, relay and measuring instruments tests and commissioning studies of all energy systems of the 154 / 33 kV transformer center built by TEİAŞ were carried out. In addition, the SCADA control system of the IEEC61850-based system was prepared.

    

3.  SİEMENS PROTECTION RÖLEYS TRAINING – VAN  

        The theory and practice training was given to TEİAŞ personnel for 2 days on the operation of Siemens brand relays used in the additional feeders of the transformer centers in Van and the programming of the relays with the computer.


2. BUCA SS – BUCA İZMİR  : PRİMERY AND SECONDERY TESTS

        Primary, secondary, relay, measuring instruments and function tests of additional 154 kV lines and transformer feeders in Buca substation, and cells in medium voltage switchgear were carried out. DC insulation tests of all medium voltage cables and high voltage tests with VLF method were performed.


1. BERG RES WPP  -  BERGAMA İZMİR  : 

        Primary and secondary tests, relay and measuring instruments tests, and function tests of all medium and high voltage equipment of the 154/36 kV transformer center of the wind farm were carried out. Equivalent impedance measurement, step and contact voltage measurements were made with the SELVAZ method, the grounding system of the substation. Equivalent impedance measurement, step and contact voltage measurements were made with the SELVAZ method on the wind turbines of the power plant. DC insulation tests of all medium voltage cables and high voltage tests with VLF method were performed.